|
Price
..........................................................................................................
|
58 512 500 ֏
|
|
Area
..........................................................................................................
|
65 m2 |
|
Number of rooms
..........................................................................................................
|
3 |
|
Floor
..........................................................................................................
|
1 |
|
Number of floors
..........................................................................................................
|
5 |
|
Renovation
..........................................................................................................
|
Major renovation |
|
Balcony
..........................................................................................................
|
Open balcony |
|
Appliances
..........................................................................................................
|
Gas stove/hob |
|
Appliances
..........................................................................................................
|
Washing machine |
|
Appliances
..........................................................................................................
|
Air conditioner |
|
Appliances
..........................................................................................................
|
Fridge |
|
Type of building
..........................................................................................................
|
Stone |
|
State of the building
..........................................................................................................
|
Finished construction |
|
Newbuild
..........................................................................................................
|
No |
|
Lift
..........................................................................................................
|
Not available |
|
Seller type
..........................................................................................................
|
Owner |
|
Code ..........................................................................................................
|
00003378 |
Located next to Shengavit Medical Center. The apartment is a 2-room apartment of the Czech project, which has been transformed into 3 rooms. It is a high first floor. New capital renovation (renovation completed in February 2025). All pipes and power cords disassembled and replaced. For sale with all furniture and appliances (furniture and appliances are new, purchased in February-April 2025). High quality sound and heat insulating aluminum windows are installed. There is a central heating system.
There is a 25 square meter basement which has 2 entrances from the apartment and from the general basement area of the building.
| Օգտատեր | |
| (094) 92-81-91 |
Yerevan, Kanaker-Zeytun
45 300 000 ֏|
Number of rooms ..........................................................................................................
|
2
|
|
Floor ..........................................................................................................
|
22
|
|
Code
..........................................................................................................
|
00010186 |
|
Date: ..........................................................................................................
|
06-03-2026 |
Yerevan, Avan
86 825 000 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
9
|
|
Code
..........................................................................................................
|
00004434 |
|
Date: ..........................................................................................................
|
27-11-2025 |
Ararat, Ararat
25 000 000 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
1
|
|
Code
..........................................................................................................
|
00006447 |
|
Date: ..........................................................................................................
|
22-01-2026 |
Yerevan, Center
90 600 000 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
1
|
|
Code
..........................................................................................................
|
00000381 |
|
Date: ..........................................................................................................
|
25-09-2025 |
Kotayk, Hrazdan
12 457 500 ֏|
Number of rooms ..........................................................................................................
|
2
|
|
Floor ..........................................................................................................
|
3
|
|
Code
..........................................................................................................
|
00010488 |
|
Date: ..........................................................................................................
|
10-03-2026 |
Gegharkuniq, Sevan
5 662 500 ֏|
Number of rooms ..........................................................................................................
|
6
|
|
Floor ..........................................................................................................
|
1
|
|
Code
..........................................................................................................
|
00006738 |
|
Date: ..........................................................................................................
|
24-01-2026 |