|
Price
..........................................................................................................
|
27 264 560 ֏
|
|
Area
..........................................................................................................
|
40 m2 |
|
Number of rooms
..........................................................................................................
|
2 |
|
Floor
..........................................................................................................
|
5 |
|
Number of bathrooms
..........................................................................................................
|
1 |
|
Number of floors
..........................................................................................................
|
9 |
|
Ceiling height
..........................................................................................................
|
2.7 m |
|
Renovation
..........................................................................................................
|
Old renovation |
|
Balcony
..........................................................................................................
|
Not available |
|
Appliances
..........................................................................................................
|
Gas stove/hob |
|
Furniture included in the price
..........................................................................................................
|
By agreement |
|
The building has
..........................................................................................................
|
Playground |
|
Type of building
..........................................................................................................
|
Panel |
|
State of the building
..........................................................................................................
|
Finished construction |
|
Newbuild
..........................................................................................................
|
No |
|
Lift
..........................................................................................................
|
New lift |
|
Parking
..........................................................................................................
|
Outdoor parking |
|
Seller type
..........................................................................................................
|
Owner |
|
Code ..........................................................................................................
|
00016089 |
For sale is a converted 1-2 bedroom apartment on the 5th floor of a 9-story panel building in Davtashen. The apartment is in average condition. The entrance door is iron, the windows are Euro, water and gas, the location of the apartment is on the south side, there is a school, a dry school, a polyclinic very close to the apartment, directly from the owner of the house without an intermediary.
| Karen Kirakosyan | |
| +374 94 753571 |
Yerevan, Arabkir
108 689 800 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
10
|
|
Code
..........................................................................................................
|
00013779 |
|
Date: ..........................................................................................................
|
22-04-2026 |
Shirak, Amasia
12 500 000 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
5
|
|
Code
..........................................................................................................
|
00007768 |
|
Date: ..........................................................................................................
|
04-02-2026 |
Yerevan, Center
121 216 760 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
3
|
|
Code
..........................................................................................................
|
00013978 |
|
Date: ..........................................................................................................
|
24-04-2026 |
Tavush, Ijevan
21 369 520 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
3
|
|
Code
..........................................................................................................
|
00006902 |
|
Date: ..........................................................................................................
|
26-01-2026 |
Yerevan, Arabkir
81 056 800 ֏|
Number of rooms ..........................................................................................................
|
6
|
|
Floor ..........................................................................................................
|
2
|
|
Code
..........................................................................................................
|
00003740 |
|
Date: ..........................................................................................................
|
20-11-2025 |
Armavir, Armavir
16 027 140 ֏|
Number of rooms ..........................................................................................................
|
2
|
|
Floor ..........................................................................................................
|
5
|
|
Code
..........................................................................................................
|
00017328 |
|
Date: ..........................................................................................................
|
29-05-2026 |