|
Price
..........................................................................................................
|
44 026 800 ֏
|
|
Area
..........................................................................................................
|
67 m2 |
|
Number of rooms
..........................................................................................................
|
2 |
|
Floor
..........................................................................................................
|
9 |
|
Number of floors
..........................................................................................................
|
10 |
|
Renovation
..........................................................................................................
|
Cosmetic renovation |
|
Balcony
..........................................................................................................
|
Not available |
|
Appliances
..........................................................................................................
|
Gas stove/hob |
|
Furniture included in the price
..........................................................................................................
|
No furniture included |
|
Type of building
..........................................................................................................
|
Panel |
|
State of the building
..........................................................................................................
|
Finished construction |
|
Newbuild
..........................................................................................................
|
No |
|
Lift
..........................................................................................................
|
Old lift |
|
Parking
..........................................................................................................
|
Covered parking |
|
Seller type
..........................................................................................................
|
Owner |
|
Code ..........................................................................................................
|
00003196 |
http://youtube.com/watch?v=yMeK8XLLyA4 - video of the apartment.
A 2-room apartment with its own stone garage is for sale.
The apartment has the possibility to build a second floor under the roof, there are 150 stones on the roof, and there are also two separate storage rooms. It is also possible to share the living room and get a second bedroom, and to connect the kitchen to the living room to get a studio version.
The apartment is renovated, iron door, wooden floor, has all utilities, heating from Baksi, has an open view of Ararat and Aragats mountain. The roof of the apartment and the garage is covered with profnastyle. Water heater installed. There is a school, kindergarten, playground, many shops nearby.
Not an agency.
Mediators DO NOT CALL
| Հարություն | |
| (095) 31-55-05 |
Yerevan, Arabkir
58 702 400 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
3
|
|
Code
..........................................................................................................
|
00003648 |
|
Date: ..........................................................................................................
|
19-11-2025 |
Yerevan, Nor Norq
137 583 750 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
12
|
|
Code
..........................................................................................................
|
00018064 |
|
Date: ..........................................................................................................
|
10-06-2026 |
Yerevan, Center
56 867 950 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
5
|
|
Code
..........................................................................................................
|
00000128 |
|
Date: ..........................................................................................................
|
18-09-2025 |
Yerevan, Center
75 212 450 ֏|
Number of rooms ..........................................................................................................
|
3
|
|
Floor ..........................................................................................................
|
2
|
|
Code
..........................................................................................................
|
00017232 |
|
Date: ..........................................................................................................
|
29-05-2026 |
Aragatsotn, Ashtarak
36 000 000 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
5
|
|
Code
..........................................................................................................
|
00019327 |
|
Date: ..........................................................................................................
|
20-06-2026 |
Yerevan, Ajapnyak
55 767 280 ֏|
Number of rooms ..........................................................................................................
|
4
|
|
Floor ..........................................................................................................
|
8
|
|
Code
..........................................................................................................
|
00018047 |
|
Date: ..........................................................................................................
|
09-06-2026 |